A client needed a New Source Review (NSR) air permit application filed with the Texas Commission on Environmental Quality (TCEQ) for a new copper tube production facility in southeast Texas
The facility featured Chinese furnace technology that was new to the United States and required substantial work to support the Best Available Control Technology analysis. Additionally, the client’s engineers were all located in China. eSPARC’s Project Manager was fluent in Mandarin and gathered all the technical information and reviewed engineering calculations with the client via conference calls.
The NSR permit was successfully negotiated and timely issued through the TCEQ’s expedited air permit application process, allowing construction to start according to schedule.